[{"data":1,"prerenderedAt":1005},["ShallowReactive",2],{"sanity-6vEXOiYual":3,"sanity-4V90Sc51PS":220,"sanity-lvJrjDx8I7":996},{"footerNav":4,"headerNav":55,"modal":212,"siteName":219},[5,31],{"_key":6,"navItems":7,"title":30},"af1e2a6bc6c3",[8,14,19,24],{"_key":9,"link":10,"title":13},"c1ba5179be7e",{"slug":11,"type":12},"/what-we-do","internal","What we do",{"_key":15,"link":16,"title":18},"ce449bad4955",{"slug":17,"type":12},"/industries","Industries",{"_key":20,"link":21,"title":23},"2cd92fd31eac",{"slug":22,"type":12},"/team","Our Team",{"_key":25,"link":26,"title":29},"fd6d326bf5aa",{"type":27,"url":28},"external","https://events.buildskills.com.au","Events","Discover",{"_key":32,"navItems":33,"title":54},"6be1d2ee10b4",[34,39,44,49],{"_key":35,"link":36,"title":38},"eeaed195d297",{"slug":37,"type":12},"/news","News",{"_key":40,"link":41,"title":43},"b4db5c771efc",{"slug":42,"type":12},"/data-and-insights/corporate","Corporate",{"_key":45,"link":46,"title":48},"2d3f0c3d91d6",{"slug":47,"type":12},"/data-and-insights/interactive-data","Interactive Data",{"_key":50,"link":51,"title":53},"97854808684a",{"slug":52,"type":12},"/contact","Connect","Info",{"navItems":56},[57,63,79,180,193,198,201,204,208],{"_key":58,"link":59,"subNavItems":61,"title":62},"fe977be8bfce",{"slug":60,"type":12},"/",null,"Home",{"_key":64,"link":65,"subNavItems":66,"title":78},"05e905d24a2f",{"slug":11,"type":12},[67,71,74],{"_key":68,"_type":69,"link":70,"title":13},"f5dfde29eb2e","subNavItem",{"slug":11,"type":12},{"_key":72,"_type":69,"link":73,"title":18},"d241ffc9ba0d",{"slug":17,"type":12},{"_key":75,"_type":69,"link":76,"title":77},"b4d71e13806b",{"slug":22,"type":12},"Team","About",{"_key":80,"link":81,"subNavItems":83,"title":179},"8de9f773c1a3",{"slug":82,"type":12},"/projects",[84,88,93,98,103,108,113,118,123,128,133,138,143,146,151,156,161,166,171,174],{"_key":85,"_type":86,"label":87},"b5e3db10de37","category","Training Projects",{"_key":89,"_type":69,"link":90,"title":92},"36dec2f41123",{"slug":91,"type":12},"/training/civil-construction-review","Civil Construction Review",{"_key":94,"_type":69,"link":95,"title":97},"961026746bbe",{"slug":96,"type":12},"/training/engineered-stone-review","Engineered Stone Review",{"_key":99,"_type":69,"link":100,"title":102},"5bddaa63c66b",{"slug":101,"type":12},"/training/hydrogen-skill-needs-in-the-plumbing-and-gas-industry","Hydrogen Skill Needs in the Plumbing and Gas Industry",{"_key":104,"_type":69,"link":105,"title":107},"380d2ca894bf",{"slug":106,"type":12},"/training/insulation-installation-and-inspection","Insulation Installation & Inspection",{"_key":109,"_type":69,"link":110,"title":112},"88b0529c1751",{"slug":111,"type":12},"/training/minimum-australian-context-gap-training-for-migrant-plumbers","Minimum Australian Context Gap Training for Migrant Plumbers",{"_key":114,"_type":69,"link":115,"title":117},"327a6446c43e",{"slug":116,"type":12},"/training/utility-locating","Utility Locating",{"_key":119,"_type":69,"link":120,"title":122},"25e1325b205b",{"slug":121,"type":12},"/training/training-product-update-implementation-of-prepare-to-work-safety-within-cpc-and-cpp","White Card Implementation",{"_key":124,"_type":69,"link":125,"title":127},"391d6e2fe46d",{"slug":126,"type":12},"/training/urban-pest-management-review","Urban Pest Management Review",{"_key":129,"_type":69,"link":130,"title":132},"f640d7ae86d8",{"slug":131,"type":12},"/training/formwork-falsework-training-product-review","Formwork Falsework Training Product Review",{"_key":134,"_type":69,"link":135,"title":137},"4d2a88980dd1",{"slug":136,"type":12},"/training/swimming-pool-and-spa-service-review","Swimming Pool and Spa Service Review",{"_key":139,"_type":69,"link":140,"title":142},"4be4a01321c7",{"slug":141,"type":12},"/training/temporary-traffic-management-ttm-skill-sets","Temporary Traffic Management (TTM) Skill Sets",{"_key":144,"_type":86,"label":145},"fc066b3cd07c","Research and Planning",{"_key":147,"_type":69,"link":148,"title":150},"6c39ea7468cf",{"slug":149,"type":12},"/housing","Housing Workforce Capacity Study",{"_key":152,"_type":69,"link":153,"title":155},"3365110270df",{"slug":154,"type":12},"/projects/vet-workforce","VET Workforce Study",{"_key":157,"_type":69,"link":158,"title":160},"86f50c9e6b1b",{"slug":159,"type":12},"/projects/vet-future-readiness-review","VET Future Readiness Review",{"_key":162,"_type":69,"link":163,"title":165},"b1e60397ea2c",{"slug":164,"type":12},"/workforce-plan","2025-26 Workforce Plan",{"_key":167,"_type":69,"link":168,"title":170},"c91ae764b8d7",{"slug":169,"type":12},"/projects/water-workforce-roadmap","Water Sector Workforce Roadmap",{"_key":172,"_type":86,"label":173},"e5b8d6be1bca","Annual Plans",{"_key":175,"_type":69,"link":176,"title":178},"72df3b1af10c",{"type":27,"url":177},"https://cdn.sanity.io/files/7v56p0it/production/00d4ef72842d800018c4dc4c3f148f5c400bcd89.pdf","Annual Training Product Development Plan 2025-26","Projects",{"_key":181,"link":182,"subNavItems":184,"title":192},"1652a5d5339e",{"slug":183,"type":12},"/data-and-insights",[185,188],{"_key":186,"_type":69,"link":187,"title":48},"7a6b83df0edf",{"slug":47,"type":12},{"_key":189,"_type":69,"link":190,"title":191},"a128f4a68698",{"slug":42,"type":12},"Corporate Publications","Data and Insights",{"_key":194,"link":195,"subNavItems":61,"title":197},"5c0e7b317c37",{"slug":196,"type":12},"/advisory-bodies","Advisory Bodies",{"_key":199,"link":200,"subNavItems":61,"title":29},"2da7044eab98",{"type":27,"url":28},{"_key":202,"link":203,"subNavItems":61,"title":38},"f2986b34811b",{"slug":37,"type":12},{"_key":205,"link":206,"subNavItems":61,"title":207},"687e5bf070e0",{"slug":52,"type":12},"Contact",{"_key":209,"link":210,"subNavItems":61,"title":211},"cb55a2efe5ea",{"type":12},"Governance ",{"buttonLink":213,"content":61,"ctaType":214,"delay":215,"enabled":216,"heading":217,"linkText":218},{"slug":159,"type":12},"form",4,true,"Subscribe to our mailing list to stay informed.","Page of the Plan","BuildSkills Australia",{"_id":221,"isTop":61,"phases":222,"projectBlocks":61,"projectHero":955,"projectTimeline":61,"seo":995,"title":102},"e5764f6a-7070-4e4c-a50c-a22aa6154ef6",[223,662,885,949],{"_key":224,"barContent":225,"content":61,"date":226,"phase":227,"projectBlocks":228,"status":660,"title":661},"40a4936e052e","Training product development.","10 February 2025","Step 1",[229,304,436,565],{"_key":230,"_type":231,"content":232,"title":303},"1d7df42c81ec","projectContent",{"_type":231,"content":233},[234,245,253,263,271,279,287,295],{"_key":235,"_type":236,"children":237,"markDefs":243,"style":244},"fa334adda49b","block",[238],{"_key":239,"_type":240,"marks":241,"text":242},"05c2036117820","span",[],"Currently, there are no officially qualified technicians available to install, maintain, or service hydrogen systems or appliances. The installation of commercial hydrogen has already commenced in Australia, making it essential to have capable plumbing and gas fitting technicians who can safely complete the work.",[],"normal",{"_key":246,"_type":236,"children":247,"markDefs":252,"style":244},"628aa21d8d3c",[248],{"_key":249,"_type":240,"marks":250,"text":251},"87e97abed3dc0",[],"This project will look to develop skill sets and approximately 20 units of competency which cover the following skills and knowledge areas across AQF levels 3-4:",[],{"_key":254,"_type":236,"children":255,"level":260,"listItem":261,"markDefs":262,"style":244},"ff3a4bc80ac6",[256],{"_key":257,"_type":240,"marks":258,"text":259},"d4bb97b10cd40",[],"Characteristic and chemistry of hydrogen",1,"bullet",[],{"_key":264,"_type":236,"children":265,"level":260,"listItem":261,"markDefs":270,"style":244},"72132154f81e",[266],{"_key":267,"_type":240,"marks":268,"text":269},"83ddc80c0c630",[],"Hydrogen storage and handling",[],{"_key":272,"_type":236,"children":273,"level":260,"listItem":261,"markDefs":278,"style":244},"b7827de94f2a",[274],{"_key":275,"_type":240,"marks":276,"text":277},"412f7688a6410",[],"Installation, commissioning, and decommissioning of hydrogen systems and appliances",[],{"_key":280,"_type":236,"children":281,"level":260,"listItem":261,"markDefs":286,"style":244},"322b1903563f",[282],{"_key":283,"_type":240,"marks":284,"text":285},"c568f4ea3efb0",[],"Hydrogen fuel cells and electrolysers",[],{"_key":288,"_type":236,"children":289,"level":260,"listItem":261,"markDefs":294,"style":244},"4bc28a97155d",[290],{"_key":291,"_type":240,"marks":292,"text":293},"5c725fe6e0d00",[],"Inspect, service and maintain",[],{"_key":296,"_type":236,"children":297,"markDefs":302,"style":244},"159cbf55cee6",[298],{"_key":299,"_type":240,"marks":300,"text":301},"f219812b05430",[],"The implications of failing to provide training to the workforce for hydrogen will create unsafe work practices and a national skills shortage of competent plumbers and gasfitters. ",[],"What we are working on",{"_key":305,"_type":231,"content":306,"title":435},"6308a30cebb7",{"_type":231,"content":307},[308,316,325,423,431],{"_key":309,"_type":236,"children":310,"markDefs":315,"style":244},"edb7d8963e45",[311],{"_key":312,"_type":240,"marks":313,"text":314},"40352a459023",[],"A Technical Committee has been established to provide expert advice, identify any impacts on learners, and possible implementation issues. The Technical Committee members will also identify any additional stakeholders that should be included in the consultation strategy to assist with this project.",[],{"_key":317,"_type":236,"children":318,"markDefs":324,"style":244},"a04aaf3005e4",[319],{"_key":320,"_type":240,"marks":321,"text":323},"ddcea8bdca76",[322],"strong","Technical Committee Members",[],{"_key":326,"_type":327,"rows":328},"6d69b057f140","table",[329,337,344,349,355,361,367,373,378,383,389,394,400,405,411,417],{"_key":330,"_type":331,"cells":332},"1b725e75-3f6d-4705-970c-f4bcd243fedb","tableRow",[333,334,335,336],"Name","Organisation","Stakeholder Type","Location",{"_key":338,"_type":331,"cells":339},"12e67df0-1ce7-43ba-9d34-a242f8a0ddff",[340,341,342,343],"Glenn Menzies","Plumbing and Pipe Trades Employees Union","Employees and their representatives / Union","Victoria",{"_key":345,"_type":331,"cells":346},"0acbc8d7-8366-4c8e-a76f-0ebc5f379f47",[347,341,342,348],"Jack Keogh","Queensland",{"_key":350,"_type":331,"cells":351},"6bfa21da-a5da-4767-90bb-df25d14721cd",[352,353,354,348],"Kent Vickers","Qld Industrial Gasfitting Services Pty Ltd & Master Plumbers Association of Qld.","Employers and their representatives / Peak bodies",{"_key":356,"_type":331,"cells":357},"1fe67ba3-dc05-45ff-9fc3-f4b4ff5e7da3",[358,359,354,360],"Michael Broomhead","ATCO Australia","Western Australia",{"_key":362,"_type":331,"cells":363},"4ec99a88-6e05-477d-9682-57d8a3a1a07f",[364,365,366,360],"John Whelan","NextGen Skills","Registered Training Organisations",{"_key":368,"_type":331,"cells":369},"c2e62b3b-e598-454d-82db-e7585a0a5b74",[370,371,366,372],"Paul Dixon","PEER Training","South Australia",{"_key":374,"_type":331,"cells":375},"94effa7c-28b9-4a2b-a0ed-df792192c7c5",[376,377,366,343],"Shayne La Combre","Plumbing Industry Climate Action Centre",{"_key":379,"_type":331,"cells":380},"1691c557-0204-498c-bb54-9cb5baae33d7",[381,382,366,343],"Andrew Mckinnon","The Gordon TAFE",{"_key":384,"_type":331,"cells":385},"9a1ff0fd-d88e-416a-91dc-950cfb84f33e",[386,387,366,388],"Anthony Backhouse","TAFE NSW","NSW",{"_key":390,"_type":331,"cells":391},"15709e04-a8be-4eb7-9142-1b932f8303eb",[392,393,366,348],"Sue Sheppard","TAFE Queensland",{"_key":395,"_type":331,"cells":396},"a31afb0c-1fa7-4db8-a323-052298381a2d",[397,398,399,348],"Paul Beaumont","RSHQ Queensland Government","State & Training Representatives (inc licencing and regulatory bodies) ",{"_key":401,"_type":331,"cells":402},"7e4f3980-13fc-4d6a-8fa4-b1490df8df61",[403,404,399,348],"Martin Driscoll","Electrical Safety Office Queensland Government",{"_key":406,"_type":331,"cells":407},"0558b272-fc04-4746-84d9-7aef68d16b05",[408,409,410,372],"Lauren Conceicao","Conceicao Consulting","Educational Expert ",{"_key":412,"_type":331,"cells":413},"e8fa967b-3a53-4359-befe-45f645d97570",[414,415,416,348],"Rob Gilman","The Service Trade College Australia","Educational Expert",{"_key":418,"_type":331,"cells":419},"0edacf4e-d6ce-49fa-95c1-8d74c334f95e",[420,421,366,422],"Travis Koch","Charles Darwin University ","Northern Territory ",{"_key":424,"_type":236,"children":425,"markDefs":430,"style":244},"7bc45215934e",[426],{"_key":427,"_type":240,"marks":428,"text":429},"67bbf7415cc2",[],"The Terms of Reference for the Technical Committee can be found below.",[],{"_key":432,"_ref":433,"_type":434},"482006fb799f","c6081413-7184-43cc-b17a-01d751dbb88d","projectResource","Technical Committee",{"_key":437,"_type":231,"content":438,"title":564},"017476e0669c",{"_type":231,"content":439},[440,461,477,501,517,533,556],{"_key":441,"_type":327,"rows":442},"e952363e0633",[443,447,451,456],{"_key":444,"_type":331,"cells":445},"5a7d934b-b525-4e67-a66d-9d58eb947c84",[446,446],"",{"_key":448,"_type":331,"cells":449},"5c79b438-4dce-4c6f-8679-9db695d74a9c",[450,226],"Project commencement date: ",{"_key":452,"_type":331,"cells":453},"a11cd442-fa5b-4377-a698-636221de6e82",[454,455],"Proposed project end date: ","13 July 2026",{"_key":457,"_type":331,"cells":458},"e10a8128-a981-4dbc-9741-2a6a69fcd067",[459,460],"Training Product Priority: ","Complex ",{"_key":462,"_type":236,"children":463,"markDefs":476,"style":244},"f4a28ce29f56",[464,468,472],{"_key":465,"_type":240,"marks":466,"text":467},"7093cc175e14",[],"The first Technical Committee meeting will be held in ",{"_key":469,"_type":240,"marks":470,"text":471},"4e51638e03f9",[322],"May 2025",{"_key":473,"_type":240,"marks":474,"text":475},"d87e35fcb27c",[],". In the Training Product Development phase, there could be up to 6 Technical Committee meetings. Meetings will be for a duration of 2-4 hours and will be held via a combination of face to face and online formats.",[],{"_key":478,"_type":236,"children":479,"markDefs":500,"style":244},"de37c7371c5b",[480,484,488,492,496],{"_key":481,"_type":240,"marks":482,"text":483},"2ad65856591f0",[],"In ",{"_key":485,"_type":240,"marks":486,"text":487},"4c619fa5e451",[322],"November 2025",{"_key":489,"_type":240,"marks":490,"text":491},"2ad65856591f2",[]," the first draft training product will be published on our website for public consultation and feedback. Further to this, from ",{"_key":493,"_type":240,"marks":494,"text":495},"2ad65856591f3",[322],"November 2025 to January 2026",{"_key":497,"_type":240,"marks":498,"text":499},"2ad65856591f4",[]," there will be two online public consultations.",[],{"_key":502,"_type":236,"children":503,"markDefs":516,"style":244},"f8f346c81b5d",[504,508,512],{"_key":505,"_type":240,"marks":506,"text":507},"7a9405d15d480",[],"From ",{"_key":509,"_type":240,"marks":510,"text":511},"6c1c5500d961",[322],"February 2026 ",{"_key":513,"_type":240,"marks":514,"text":515},"7a9405d15d482",[],"the Technical Committee will be required to meet again to conduct further revisions to the draft training products, based on feedback received through the public consultation.",[],{"_key":518,"_type":236,"children":519,"markDefs":532,"style":244},"3b96b8fcc1b8",[520,524,528],{"_key":521,"_type":240,"marks":522,"text":523},"bdba93d9d03a0",[],"The final draft training product will be sent to our Commonwealth and State/Territory Senior Responsible Officers in ",{"_key":525,"_type":240,"marks":526,"text":527},"bdba93d9d03a1",[322],"April 2026",{"_key":529,"_type":240,"marks":530,"text":531},"bdba93d9d03a2",[],".",[],{"_key":534,"_type":236,"children":535,"markDefs":555,"style":244},"6d7d6454422e",[536,540,544,548,552],{"_key":537,"_type":240,"marks":538,"text":539},"b3ee6f15aea40",[],"The finalisation and submission of the training product to the Assurance Body is proposed to be made in ",{"_key":541,"_type":240,"marks":542,"text":543},"b3ee6f15aea41",[322],"June 2026",{"_key":545,"_type":240,"marks":546,"text":547},"b3ee6f15aea42",[],". Implementation and promotion of the new training product is expected to commence in ",{"_key":549,"_type":240,"marks":550,"text":551},"b3ee6f15aea43",[322],"July 2026",{"_key":553,"_type":240,"marks":554,"text":531},"b3ee6f15aea44",[],[],{"_key":557,"_type":236,"children":558,"markDefs":563,"style":244},"bb2ea330c6c3",[559],{"_key":560,"_type":240,"marks":561,"text":562},"e0063821b5140",[],"Please note these dates may be subject to change throughout the project.",[],"Project Timelines",{"_key":566,"_type":231,"content":567,"title":659},"5ab8ddf5c5c9",{"_type":231,"content":568},[569,577,585,593],{"_key":570,"_type":236,"children":571,"markDefs":576,"style":244},"e9ef0533b733",[572],{"_key":573,"_type":240,"marks":574,"text":575},"4831741445780",[],"BuildSkills has established a Consultation Strategy that identifies key stakeholders and outlines mechanisms for engaging with them during the drafting of training products. This strategy includes the management of public consultations on the drafted products and the processing of feedback received.",[],{"_key":578,"_type":236,"children":579,"markDefs":584,"style":244},"1a4fccf00ce4",[580],{"_key":581,"_type":240,"marks":582,"text":583},"630335ea44c10",[],"The consultation methods employed by BuildSkills consist of in-person and virtual meetings, online surveys, focus groups, industry workshops, and feedback submitted through the website, or via email.",[],{"_key":586,"_type":236,"children":587,"markDefs":592,"style":244},"ec6caaac06a7",[588],{"_key":589,"_type":240,"marks":590,"text":591},"979c80080ab30",[],"BuildSkills will engage the following stakeholders throughout the training product development process. ",[],{"_key":594,"_type":327,"rows":595},"6bf9e74d96eb",[596,602,608,614,620,625,629,633,637,643,649,654],{"_key":597,"_type":331,"cells":598},"71885b9d-c949-47dc-ae32-a764aa5e84d9",[599,600,601],"Organisation ","Stakeholder type","Footprint ",{"_key":603,"_type":331,"cells":604},"9c614afa-c26f-4b37-a5db-e802de9cbd74",[605,606,607],"Plumbing Industry Climate Action Centre (PICAC)","RTO","National",{"_key":609,"_type":331,"cells":610},"6b80ac10-b7d7-4d4f-bca6-186fbce141b1",[611,612,613],"Master Plumbers and Mechanical Services Association of Australia  ","Employers and their representatives/peak bodies","National (through each State Association)",{"_key":615,"_type":331,"cells":616},"2e5bc0a8-07dd-4ac6-8f1a-4db70d420bd6",[617,618,619],"Plumbing and Pipe Trades Employees Union ","Employees and their representatives/unions","National (through each State Union Office)",{"_key":621,"_type":331,"cells":622},"aede7962-b5f5-4bcd-a6be-28d7ac2bd1be",[623,624,343],"Energy Safe Victoria ","Licensing and Regulatory ",{"_key":626,"_type":331,"cells":627},"7e7621f3-2549-4c42-8a02-21e1f6bea4ac",[628,624,388],"Hydrogen & Clean Energy Branch ",{"_key":630,"_type":331,"cells":631},"e5fc4dba-11fd-4f8b-9da9-9815179ac588",[632,624,607],"Energy and Climate Minister’s office. ",{"_key":634,"_type":331,"cells":635},"f78137d5-de61-403c-b076-5f106035c446",[636,612,607],"Australian Pipelines and Gas Association",{"_key":638,"_type":331,"cells":639},"1b36013b-44f0-403a-b0cf-98b64a8cd968",[640,641,642],"State Training Authorities","The Commonwealth, state, and territory governments","National ",{"_key":644,"_type":331,"cells":645},"d7cb2d3b-a52b-4b83-a029-482aa66fba00",[646,647,648],"The Commonwealth, State and Territory Governments","Licensing and Regulatory Bodies","As per each jurisdiction",{"_key":650,"_type":331,"cells":651},"d3fca016-fa4b-4268-bf0f-f0d4a6dda6ae",[652,653,607],"RTOs and TAFE with the relevant training products on scope","Registered Training Organisation (RTO)",{"_key":655,"_type":331,"cells":656},"8ab71fd5-0926-4731-b2cf-313fd735b687",[657,658,607],"Jobs and Skills Councils ","JSC","Consultation Strategy","completed","Project Commencement",{"_key":663,"barContent":664,"content":61,"date":665,"phase":666,"projectBlocks":667,"status":660,"title":884},"d2f51685123f","Drafted Products released for stakeholder feedback.","10 November 2025","Step 2",[668,720,810,832,863],{"_key":669,"_type":231,"content":670,"title":719},"e2220d572579",{"_type":231,"content":671},[672,680,688,700,711],{"_key":673,"_type":236,"children":674,"markDefs":679,"style":244},"88f555d849c9",[675],{"_key":676,"_type":240,"marks":677,"text":678},"45793b888fb7",[],"We have engaged with our industry to develop draft training products. ",[],{"_key":681,"_type":236,"children":682,"markDefs":687,"style":244},"9723b486a16e",[683],{"_key":684,"_type":240,"marks":685,"text":686},"49f6c8d76b2d",[],"The impacted training products include:",[],{"_key":689,"_type":236,"children":690,"level":260,"listItem":261,"markDefs":696,"style":244},"69bf5984955d",[691],{"_key":692,"_type":240,"marks":693,"text":695},"b6e73e74cacb",[694],"50660bff6f86","CPC32420 Certificate III in Plumbing",[697],{"_key":694,"_type":698,"href":699},"link","https://training.gov.au/training/details/CPC32420/qualdetails",{"_key":701,"_type":236,"children":702,"level":260,"listItem":261,"markDefs":708,"style":244},"2572df6b6ede",[703],{"_key":704,"_type":240,"marks":705,"text":707},"016b658cde47",[706],"ea419db3c212","CPC40920 Certificate IV in Plumbing and Services",[709],{"_key":706,"_type":698,"href":710},"https://training.gov.au/training/details/CPC40920/qualdetails",{"_key":712,"_type":236,"children":713,"markDefs":718,"style":244},"3b52f8a109aa",[714],{"_key":715,"_type":240,"marks":716,"text":717},"c9926bceabd6",[],"We have reviewed ten units of competency and developed one new unit. We are seeking your feedback and advice on the changes made.",[],"What we are up to",{"_key":721,"_type":231,"content":722,"title":809},"f79906f8621a",{"_type":231,"content":723},[724,742,804],{"_key":725,"_type":327,"rows":726},"4acf44461ae0",[727,732,737],{"_key":728,"_type":331,"cells":729},"bb4ceaaa6866",[730,731],"Qualification","Draft document",{"_key":733,"_type":331,"cells":734},"2fed6f3a8740",[735,736],"CPC40920 Certificate IV in Plumbing and Services","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/13ecf6a265d9af8e9313dd7ca37b087951edc7ff.pdf\">Download Qual>\u003C/a>",{"_key":738,"_type":331,"cells":739},"9aa5f412-0252-41d1-871f-42979eddb379",[740,741],"CPC3XXX Certificate III in Plumbing","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/4d0c8f9e97f9e11e12bf7c96e222678349e51ad3.pdf\">Download Qual>\u003C/a>",{"_key":743,"_type":327,"rows":744},"6c7f96e2ef59",[745,749,754,759,764,769,774,779,784,789,794,799],{"_key":746,"_type":331,"cells":747},"7abf8abca588",[748,731],"Unit of competency",{"_key":750,"_type":331,"cells":751},"5585e7c29db7",[752,753],"CPCPGS4XXX Install, commission and service Type B gas appliances","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/13de9ba369081d4ca618fc905171b8b5c722e845.pdf\">Download Draft UoC>\u003C/a>",{"_key":755,"_type":331,"cells":756},"cc88faf509f2",[757,758],"CPCPGSXX10 Size and install consumer gas piping systems","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/390b8ff8388b3c1f5e0004ed0aeb6640a55d60f0.pdf\">Download Draft UoC>\u003C/a>",{"_key":760,"_type":331,"cells":761},"079349a499dd",[762,763],"CPCPGSXX11 Install and commission Type A gas appliances","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/38d4dd0f1d329641b42eba11a2bcdbc883483ae3.pdf\">Download Draft UoC>\u003C/a>",{"_key":765,"_type":331,"cells":766},"4199b7d68f28",[767,768],"CPCPGSXXX3 Install gas pressure control equipment","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/a43de473612a25a5402bb2efec262c6d5ccc406c.pdf\">Download Draft UoC>\u003C/a>",{"_key":770,"_type":331,"cells":771},"5c5865c1c3a0",[772,773],"CPCPGSXXX4 Install gas appliance flues","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/b32fa9172a8e1c022e2ea5ab36090edd81556655.pdf\">Download Draft UoC>\u003C/a>",{"_key":775,"_type":331,"cells":776},"994e616a5385",[777,778],"CPCPGSXXX5 Purge consumer piping","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/806dbb5cad35cdce02ef59e0729a5f9e986448e7.pdf\">Download Draft UoC>\u003C/a>",{"_key":780,"_type":331,"cells":781},"46143e06414d",[782,783],"CPCPGSXXX6 Maintain Type A gas appliances","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/84fbc994c2527c4776a7bc22ec457549f4bb0596.pdf\">Download Draft UoC>\u003C/a>",{"_key":785,"_type":331,"cells":786},"2d97421f9944",[787,788],"CPCPGSXXX7 Disconnect and reconnect Type A gas appliances","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/9ec443be7ed10ffd11074ee2c2b1247ebefbb76c.pdf\">Download Draft UoC>\u003C/a>",{"_key":790,"_type":331,"cells":791},"fc599a1a07b6",[792,793],"CPCPGSXXX8 Calculate and install ventilation for Type A Gas appliances","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/e23a60f04a3049566d441d63d4543ddbfeaacbf4.pdf\">Download Draft UoC>\u003C/a>",{"_key":795,"_type":331,"cells":796},"4a17098a0dcd",[797,798],"CPCPGSXXX9 Install gas sub-meters","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/b95de94e22ccd40aee8d99f9a932fcd21e59643b.pdf\">Download Draft UoC>\u003C/a>",{"_key":800,"_type":331,"cells":801},"09ba717c-ae1e-4b65-8764-8d3f28a42704",[802,803],"CPCPGSXXX1 Assess operational risk when working with hydrogen","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/27ff4671b3d79eafc8ee46e1a6da36c1459fe6de.pdf\">Download Draft UoC>\u003C/a>",{"_key":805,"_type":236,"children":806,"style":244},"a88ac12074de",[807],{"_key":808,"_type":240,"text":446},"57eee4639f4c","Draft Training Products ready for your feedback",{"_key":811,"_type":231,"content":812,"title":831},"31c7bd0802a0",{"_type":231,"content":813},[814,826],{"_key":815,"_type":327,"rows":816},"b438fd47924f",[817,821],{"_key":818,"_type":331,"cells":819},"ebd7ea18d716",[820,731],"Companion Volume Implementation Guide",{"_key":822,"_type":331,"cells":823},"c7e2112d0ba3",[824,825],"CPC Companion Volume Implementation Guide","\u003Ca target=“_blank\" href=\"https://cdn.sanity.io/files/7v56p0it/production/4407f5bc4b4514da7862012160e40b0a9ac1aa98.pdf\">Download Draft CVIG>\u003C/a>",{"_key":827,"_type":236,"children":828,"style":244},"6e22f8122d59",[829],{"_key":830,"_type":240,"text":446},"33467a5452aa","Draft Companion Volume Implementation Guide ready for your feedback",{"_key":833,"_type":231,"content":834,"title":862},"be2f7859744a",{"_type":231,"content":835},[836,844,855],{"_key":837,"_type":236,"children":838,"markDefs":843,"style":244},"182ec37055bb",[839],{"_key":840,"_type":240,"marks":841,"text":842},"11c50b871f2f",[],"This summary details the changes made to the training products, outlining the reasons for these changes and provides the mapping information.",[],{"_key":845,"_type":236,"children":846,"markDefs":852,"style":244},"055594bb2207",[847],{"_key":848,"_type":240,"marks":849,"text":851},"35b4ae52eb00",[322,850],"7ab42bc353ba","Access the Summary of Change here.",[853],{"_key":850,"_type":698,"href":854},"https://cdn.sanity.io/files/7v56p0it/production/5ef5f5b9d07fba9a65faaa5d64438614903d62cd.pdf",{"_key":856,"_type":236,"children":857,"markDefs":861,"style":244},"6e5d39e63c81",[858],{"_key":859,"_type":240,"marks":860,"text":446},"9c09a045897c",[],[],"The Summary of Changes",{"_key":864,"_type":231,"content":865,"title":883},"85c82648605e",{"_type":231,"content":866},[867,875],{"_key":868,"_type":236,"children":869,"markDefs":874,"style":244},"9be2ba262670",[870],{"_key":871,"_type":240,"marks":872,"text":873},"80acbf97c0f0",[],"BuildSkills concluded a series of webinars aimed at keeping industry stakeholders informed about the proposed amendments to our training products. During these sessions, we provided an overview of the changes and outlined how participants could submit their feedback through our consultation channels.",[],{"_key":876,"_type":236,"children":877,"markDefs":882,"style":244},"a89cac0354d3",[878],{"_key":879,"_type":240,"marks":880,"text":881},"9f847bebfe77",[],"We thank everyone who participated. We are currently assessing the valuable feedback received and compiling insights to guide our next steps. Your input is invaluable as we work towards improving our training products.",[],"Consultation Events","Training Product Draft Consultation ",{"_key":886,"barContent":887,"content":61,"date":888,"phase":889,"projectBlocks":890,"status":947,"title":948},"9316c694a083","Updating training products in line with feedback.","2 February 2026","Step 3",[891],{"_key":892,"_type":231,"content":893,"title":303},"0517ad34b561",{"_type":231,"content":894},[895,903,911,930],{"_key":896,"_type":236,"children":897,"markDefs":902,"style":244},"f970dc2dc090",[898],{"_key":899,"_type":240,"marks":900,"text":901},"1eb8018ead05",[],"BuildSkills has reviewed the feedback received. ",[],{"_key":904,"_type":236,"children":905,"markDefs":910,"style":244},"381c4ec54080",[906],{"_key":907,"_type":240,"marks":908,"text":909},"c86669cd4bf6",[],"The feedback we received has been invaluable in guiding our next steps. We appreciate your insights and have made adjustments to ensure that the final products reflect the broad consensus of our stakeholders.",[],{"_key":912,"_type":236,"children":913,"markDefs":927,"style":244},"a456608ddd65",[914,918,923],{"_key":915,"_type":240,"marks":916,"text":917},"b633811ed4c6",[],"The Summary of Change document has been updated to reflect the modifications made. The updated document can be ",{"_key":919,"_type":240,"marks":920,"text":922},"d00bcbf4da01",[921],"5f318e6dc282","downloaded here",{"_key":924,"_type":240,"marks":925,"text":926},"d5c2e1885d63",[],". ",[928],{"_key":921,"_type":698,"href":929},"https://cdn.sanity.io/files/7v56p0it/production/6809f7dc5ae8c5e5b47b2205761a3382ee39523e.docx",{"_key":931,"_type":236,"children":932,"markDefs":944,"style":244},"7a507cc5537f",[933,937,941],{"_key":934,"_type":240,"marks":935,"text":936},"a7f062998e16",[],"The Consultation log has been updated reflect the feedback received and to include a high-level summary. The Log can be ",{"_key":938,"_type":240,"marks":939,"text":922},"f1c7c1d441ee",[940],"a24afd79a6a0",{"_key":942,"_type":240,"marks":943,"text":926},"1575e7b9018f",[],[945],{"_key":940,"_type":698,"href":946},"https://cdn.sanity.io/files/7v56p0it/production/f7d0b2970fa0e705e61a600f3846e79f6f2301ec.xlsx","active","Incorporating Feedback",{"_key":950,"barContent":951,"content":61,"date":61,"phase":952,"projectBlocks":61,"status":953,"title":954},"73fd389f62d5","Training products for consensus.","Step 4","inactive","Training Products",{"_type":956,"authors":957,"cardSubTitle":979,"cardTitle":980,"image":981,"lines":985,"subTitle":994,"title":102},"heroProjects",[958,970],{"_key":959,"_type":960,"cardEmail":961,"cardImage":962,"cardName":968,"cardPhone":969},"9c902de02b8e","author","AmberM@buildskills.com.au",{"_type":963,"alt":964,"asset":965},"image","Amber Mastrangeli",{"_ref":966,"_type":967},"image-4a4024629541a3563535cab38a94be2a1c118644-1024x1024-jpg","reference","Amber Mastrangeli, Project Manager.","(02) 8286 2155",{"_key":971,"_type":960,"cardEmail":972,"cardImage":973,"cardName":977,"cardPhone":978},"64170b7219ef","IngridM@buildskills.com.au",{"_type":963,"alt":974,"asset":975},"Ingrid Mountford",{"_ref":976,"_type":967},"image-9fc4026d2451186e1174f86e9e8f88624ca24e9e-240x320-jpg","Ingrid Mountford, Industry Engagement Lead. ","0402 361 920","Project documents","Project Management Team ",{"_type":963,"alt":982,"asset":983},"hydrogen ",{"_ref":984,"_type":967},"image-59749a29f8877f2d02b21f96598a336923fcd59e-2500x1667-jpg",[986],{"_key":987,"_type":988,"file":989,"title":993},"c82b93d06992","line",{"_type":990,"asset":991},"file",{"_ref":992,"_type":967},"file-60842f791090f981bfcc58b76f6e9dead2a23312-pdf","Project Overview & Consultation Strategy","Training Product Development",{"description":61,"image":61,"title":102},{"description":61,"downloads":997,"group":61,"hideTitle":61,"title":1004},[998],{"_key":999,"file":1000,"label":1003},"9d2ac780d184",{"_type":990,"asset":1001},{"_ref":1002,"_type":967},"file-aa42cc45c5d3a7fa0afe429f57b905572cc98a3d-pdf","Terms of Reference","Hydrogen Project Terms of Reference",1776294180779]