[{"data":1,"prerenderedAt":338},["ShallowReactive",2],{"single-news-new-report-modern-methods-of-construction-workforce-and-skills-implications":3,"sanity-6vEXOiYual":62},{"author":4,"body":13,"listingImage":51,"publishedAt":55,"seo":56,"slug":59,"title":58},{"image":5,"linkedIn":11,"name":12},{"_type":6,"alt":7,"asset":8},"image","Jacob Fredericks, Director Policy and Advocacy",{"_ref":9,"_type":10},"image-2537d37350371430aa92260f49f69e61f1beef85-970x970-png","reference","https://au.linkedin.com/company/buildskills-australia","BuildSkills Australia",[14,25,33,41],{"_key":15,"_type":16,"children":17,"markDefs":23,"style":24},"ae4c44a7ef82","block",[18],{"_key":19,"_type":20,"marks":21,"text":22},"297079197467","span",[],"The report finds that Modern Methods of Construction (MMC) could change where and how construction work is performed, shifting more activity into design, planning, manufacturing and logistics, while site-based work becomes increasingly focused on assembly, installation and integration. Rather than creating an entirely new occupational ecosystem, MMC changes the mix of labour required and places greater emphasis on coordination and expertise earlier in the construction process.",[],"normal",{"_key":26,"_type":16,"children":27,"markDefs":32,"style":24},"e31783c34cef",[28],{"_key":29,"_type":20,"marks":30,"text":31},"ab8296d5d73c",[],"The study identifies the most significant capability gap among the professional and paraprofessional workers whose decisions shape projects before they reach the factory or construction site. Existing construction, manufacturing and training pathways provide much of the foundation required, but stronger capability is needed in areas including design for manufacture and assembly, digital coordination, production planning, logistics and system integration.",[],{"_key":34,"_type":16,"children":35,"markDefs":40,"style":24},"11ea77894a21",[36],{"_key":37,"_type":20,"marks":38,"text":39},"1732dbad1a70",[],"The report concludes that broad new qualifications or a dedicated MMC apprenticeship are not the immediate priority. Instead, it proposes a targeted response focused on professional and paraprofessional upskilling, structured workplace learning for proprietary systems, clearer signalling of existing pathways into MMC roles, and continued monitoring of adoption before larger training-system reforms are considered.",[],{"_key":42,"_type":43,"buttonLink":44,"linkText":50},"ced63edb70bb","button",{"_type":45,"fileLink":46,"type":47},"link",{"_type":47,"asset":48},"file",{"_ref":49,"_type":10},"file-d18993efee5127df614ba068fc657c7c02ff209d-pdf","Read the report",{"_type":6,"alt":52,"asset":53},"MMC",{"_ref":54,"_type":10},"image-35216f21a7d9402d6952cd6ca417d0fb5680fb3b-1249x873-png","2026-10-12T04:21:00.000Z",{"description":57,"image":57,"title":58},null,"New report: Modern Methods of Construction Workforce and skills implications",{"_type":60,"current":61},"slug","new-report-modern-methods-of-construction-workforce-and-skills-implications",{"footerNav":63,"headerNav":114,"modal":330,"siteName":12},[64,90],{"_key":65,"navItems":66,"title":89},"af1e2a6bc6c3",[67,73,78,83],{"_key":68,"link":69,"title":72},"c1ba5179be7e",{"slug":70,"type":71},"/what-we-do","internal","What we do",{"_key":74,"link":75,"title":77},"ce449bad4955",{"slug":76,"type":71},"/industries","Industries",{"_key":79,"link":80,"title":82},"2cd92fd31eac",{"slug":81,"type":71},"/team","Our Team",{"_key":84,"link":85,"title":88},"fd6d326bf5aa",{"type":86,"url":87},"external","https://events.buildskills.com.au","Events","Discover",{"_key":91,"navItems":92,"title":113},"6be1d2ee10b4",[93,98,103,108],{"_key":94,"link":95,"title":97},"eeaed195d297",{"slug":96,"type":71},"/news","News",{"_key":99,"link":100,"title":102},"b4db5c771efc",{"slug":101,"type":71},"/data-and-insights/corporate","Corporate",{"_key":104,"link":105,"title":107},"2d3f0c3d91d6",{"slug":106,"type":71},"/data-and-insights/interactive-data","Interactive Data",{"_key":109,"link":110,"title":112},"97854808684a",{"slug":111,"type":71},"/contact","Connect","Info",{"navItems":115},[116,121,157,293,311,316,319,322,326],{"_key":117,"link":118,"subNavItems":57,"title":120},"fe977be8bfce",{"slug":119,"type":71},"/","Home",{"_key":122,"link":123,"subNavItems":124,"title":156},"05e905d24a2f",{"type":47},[125,129,134,139,144,149,152],{"_key":126,"_type":127,"link":128,"title":72},"f5dfde29eb2e","subNavItem",{"slug":70,"type":71},{"_key":130,"_type":127,"link":131,"title":133},"4d19f02259ba",{"slug":132,"type":71},"/yournextbigproject","Your Next Big Project",{"_key":135,"_type":127,"link":136,"title":138},"c02878353d3c",{"slug":137,"type":71},"/resources","Resources",{"_key":140,"_type":127,"link":141,"title":143},"1b6f3623b03c",{"slug":142,"type":71},"/how-do-i-start-my-career-as-a-trainer","Getting started",{"_key":145,"_type":127,"link":146,"title":148},"4f46a5aaf2dc",{"slug":147,"type":71},"/why-be-a-trainer","Why be a trainer",{"_key":150,"_type":127,"link":151,"title":77},"d241ffc9ba0d",{"slug":76,"type":71},{"_key":153,"_type":127,"link":154,"title":155},"b4d71e13806b",{"slug":81,"type":71},"Team","About",{"_key":158,"link":159,"subNavItems":161,"title":292},"8de9f773c1a3",{"slug":160,"type":71},"/projects",[162,166,171,176,181,186,191,196,201,206,211,216,221,226,231,236,241,246,249,254,259,264,269,274,279,282,287],{"_key":163,"_type":164,"label":165},"b5e3db10de37","category","Training Projects",{"_key":167,"_type":127,"link":168,"title":170},"36dec2f41123",{"slug":169,"type":71},"/training/civil-construction-review","Civil Construction Review",{"_key":172,"_type":127,"link":173,"title":175},"961026746bbe",{"slug":174,"type":71},"/training/engineered-stone-review","Engineered Stone Review",{"_key":177,"_type":127,"link":178,"title":180},"5bddaa63c66b",{"slug":179,"type":71},"/training/hydrogen-skill-needs-in-the-plumbing-and-gas-industry","Hydrogen Skill Needs in the Plumbing and Gas Industry",{"_key":182,"_type":127,"link":183,"title":185},"380d2ca894bf",{"slug":184,"type":71},"/training/insulation-installation-and-inspection","Insulation Installation & Inspection",{"_key":187,"_type":127,"link":188,"title":190},"327a6446c43e",{"slug":189,"type":71},"/training/utility-locating","Utility Locating",{"_key":192,"_type":127,"link":193,"title":195},"25e1325b205b",{"slug":194,"type":71},"/training/training-product-update-implementation-of-prepare-to-work-safety-within-cpc-and-cpp","White Card Implementation",{"_key":197,"_type":127,"link":198,"title":200},"391d6e2fe46d",{"slug":199,"type":71},"/training/urban-pest-management-review","Urban Pest Management Review",{"_key":202,"_type":127,"link":203,"title":205},"f640d7ae86d8",{"slug":204,"type":71},"/training/formwork-falsework-training-product-review","Formwork Falsework Training Product Review",{"_key":207,"_type":127,"link":208,"title":210},"4d2a88980dd1",{"slug":209,"type":71},"/training/swimming-pool-and-spa-service-review","Swimming Pool and Spa Service Review",{"_key":212,"_type":127,"link":213,"title":215},"4be4a01321c7",{"slug":214,"type":71},"/training/temporary-traffic-management-ttm-skill-sets","Temporary Traffic Management (TTM) Skill Sets",{"_key":217,"_type":127,"link":218,"title":220},"339e8d8fe80bfc79b0fd1de24abc87d5",{"slug":219,"type":71},"/training/home-energy-efficiency-and-sustainability","Home Energy Efficiency and Sustainability",{"_key":222,"_type":127,"link":223,"title":225},"e5afb4eaf741",{"slug":224,"type":71},"/training/fencing-and-gate-industry","Fencing and Gate Industry",{"_key":227,"_type":127,"link":228,"title":230},"59cb81d0ab52033558ad856eb33323b5",{"slug":229,"type":71},"/training/Crane-Hoist-Lift-Operator","Crane, Hoist or Lift Operator Training Product Review",{"_key":232,"_type":127,"link":233,"title":235},"deb205c1dd16254ddee0760a5422f4dc",{"slug":234,"type":71},"/training/fire-protection-training-product-review-and-development","Fire Protection Training Product Review and Development",{"_key":237,"_type":127,"link":238,"title":240},"7e49d1b02852e42839332ee9842eb984",{"slug":239,"type":71},"/training/fire-protection-inspection-and-test-training-product-review","Fire Protection Inspection and Test Training Product Review",{"_key":242,"_type":127,"link":243,"title":245},"526857e1dbce8801000de952f4df6391",{"slug":244,"type":71},"/training/Plumbing Entry Level Pathway","Entry Level Pathways into Plumbing Training Product Development",{"_key":247,"_type":164,"label":248},"fc066b3cd07c","Research and Planning",{"_key":250,"_type":127,"link":251,"title":253},"050e91eba67a",{"slug":252,"type":71},"/mobility","Residential Construction Mobility Study",{"_key":255,"_type":127,"link":256,"title":258},"6c39ea7468cf",{"slug":257,"type":71},"/housing","Housing Workforce Capacity Study",{"_key":260,"_type":127,"link":261,"title":263},"3365110270df",{"slug":262,"type":71},"/projects/vet-workforce","VET Workforce Study",{"_key":265,"_type":127,"link":266,"title":268},"86f50c9e6b1b",{"slug":267,"type":71},"/projects/vet-future-readiness-review","VET Future Readiness Review",{"_key":270,"_type":127,"link":271,"title":273},"b1e60397ea2c",{"slug":272,"type":71},"/workforce-plan","2025-26 Workforce Plan",{"_key":275,"_type":127,"link":276,"title":278},"c91ae764b8d7",{"slug":277,"type":71},"/projects/water-workforce-roadmap","Water Sector Workforce Roadmap",{"_key":280,"_type":164,"label":281},"e5b8d6be1bca","Annual Plans",{"_key":283,"_type":127,"link":284,"title":286},"b6df4362a6539c7457cd892c8a533aa4",{"type":86,"url":285},"https://cdn.sanity.io/files/7v56p0it/production/4f8af87c928155d7ac77deeb6664ac535adb8caf.pdf","Annual Training Product Development Plan 2026-27",{"_key":288,"_type":127,"link":289,"title":291},"81d9bcbc9582bd13491a7129e26e4958",{"type":86,"url":290},"https://cdn.sanity.io/files/7v56p0it/production/5e21d53efe436cfec761b7a394b2602744784705.pdf","Annual Implementation, Promotion and Monitoring Plan 2026-27","Projects",{"_key":294,"link":295,"subNavItems":297,"title":310},"1652a5d5339e",{"slug":296,"type":71},"/data-and-insights",[298,301,305],{"_key":299,"_type":127,"link":300,"title":107},"7a6b83df0edf",{"slug":106,"type":71},{"_key":302,"_type":127,"link":303,"title":304},"a128f4a68698",{"slug":101,"type":71},"Corporate Publications",{"_key":306,"_type":127,"link":307,"title":309},"2c858731c5b8",{"type":86,"url":308}," https://www.dewr.gov.au/skills-reform/resources/buildskills-australias-2026-statement-priorities-and-statement-response","Statement of Priorities and Response","Data and Insights",{"_key":312,"link":313,"subNavItems":57,"title":315},"5c0e7b317c37",{"slug":314,"type":71},"/advisory-bodies","Advisory Bodies",{"_key":317,"link":318,"subNavItems":57,"title":88},"2da7044eab98",{"type":86,"url":87},{"_key":320,"link":321,"subNavItems":57,"title":97},"f2986b34811b",{"slug":96,"type":71},{"_key":323,"link":324,"subNavItems":57,"title":325},"687e5bf070e0",{"slug":111,"type":71},"Contact",{"_key":327,"link":328,"subNavItems":57,"title":329},"cb55a2efe5ea",{"type":71},"Governance ",{"buttonLink":331,"content":332,"ctaType":333,"delay":334,"enabled":335,"heading":336,"linkText":337},{"slug":267,"type":71},"We would like to provide an update regarding the recent issue affecting a number of CPC training products within the latest release on training.gov.au (TGA).\n\nTGA has advised that a system issue incorrectly identified a small number of products as deleted, resulting in status changes and end dates being displayed that did not reflect the current status of the products. The issue has now been rectified and the affected products have been restored to a status of Current.\n\nIn addition to this matter, a number of qualification-related issues have been identified within the release and are continuing to be worked through with TGA.\n\nWe appreciate stakeholders' patience and understanding while these matters are addressed and will provide further updates as information becomes available.","none",1,false,"Update on training.gov.au issue ","Page of the Plan",1791857211232]