[{"data":1,"prerenderedAt":658},["ShallowReactive",2],{"sanity-6vEXOiYual":3,"sanity-Om6tptPmmB":220,"sanity-AwBT3AuDE7":223,"sanity-LSDHmAWf5C":234},{"footerNav":4,"headerNav":55,"modal":212,"siteName":219},[5,31],{"_key":6,"navItems":7,"title":30},"af1e2a6bc6c3",[8,14,19,24],{"_key":9,"link":10,"title":13},"c1ba5179be7e",{"slug":11,"type":12},"/what-we-do","internal","What we do",{"_key":15,"link":16,"title":18},"ce449bad4955",{"slug":17,"type":12},"/industries","Industries",{"_key":20,"link":21,"title":23},"2cd92fd31eac",{"slug":22,"type":12},"/team","Our Team",{"_key":25,"link":26,"title":29},"fd6d326bf5aa",{"type":27,"url":28},"external","https://events.buildskills.com.au","Events","Discover",{"_key":32,"navItems":33,"title":54},"6be1d2ee10b4",[34,39,44,49],{"_key":35,"link":36,"title":38},"eeaed195d297",{"slug":37,"type":12},"/news","News",{"_key":40,"link":41,"title":43},"b4db5c771efc",{"slug":42,"type":12},"/data-and-insights/corporate","Corporate",{"_key":45,"link":46,"title":48},"2d3f0c3d91d6",{"slug":47,"type":12},"/data-and-insights/interactive-data","Interactive Data",{"_key":50,"link":51,"title":53},"97854808684a",{"slug":52,"type":12},"/contact","Connect","Info",{"navItems":56},[57,63,79,180,193,198,201,204,208],{"_key":58,"link":59,"subNavItems":61,"title":62},"fe977be8bfce",{"slug":60,"type":12},"/",null,"Home",{"_key":64,"link":65,"subNavItems":66,"title":78},"05e905d24a2f",{"slug":11,"type":12},[67,71,74],{"_key":68,"_type":69,"link":70,"title":13},"f5dfde29eb2e","subNavItem",{"slug":11,"type":12},{"_key":72,"_type":69,"link":73,"title":18},"d241ffc9ba0d",{"slug":17,"type":12},{"_key":75,"_type":69,"link":76,"title":77},"b4d71e13806b",{"slug":22,"type":12},"Team","About",{"_key":80,"link":81,"subNavItems":83,"title":179},"8de9f773c1a3",{"slug":82,"type":12},"/projects",[84,88,93,98,103,108,113,118,123,128,133,138,143,146,151,156,161,166,171,174],{"_key":85,"_type":86,"label":87},"b5e3db10de37","category","Training Projects",{"_key":89,"_type":69,"link":90,"title":92},"36dec2f41123",{"slug":91,"type":12},"/training/civil-construction-review","Civil Construction Review",{"_key":94,"_type":69,"link":95,"title":97},"961026746bbe",{"slug":96,"type":12},"/training/engineered-stone-review","Engineered Stone Review",{"_key":99,"_type":69,"link":100,"title":102},"5bddaa63c66b",{"slug":101,"type":12},"/training/hydrogen-skill-needs-in-the-plumbing-and-gas-industry","Hydrogen Skill Needs in the Plumbing and Gas Industry",{"_key":104,"_type":69,"link":105,"title":107},"380d2ca894bf",{"slug":106,"type":12},"/training/insulation-installation-and-inspection","Insulation Installation & Inspection",{"_key":109,"_type":69,"link":110,"title":112},"88b0529c1751",{"slug":111,"type":12},"/training/minimum-australian-context-gap-training-for-migrant-plumbers","Minimum Australian Context Gap Training for Migrant Plumbers",{"_key":114,"_type":69,"link":115,"title":117},"327a6446c43e",{"slug":116,"type":12},"/training/utility-locating","Utility Locating",{"_key":119,"_type":69,"link":120,"title":122},"25e1325b205b",{"slug":121,"type":12},"/training/training-product-update-implementation-of-prepare-to-work-safety-within-cpc-and-cpp","White Card Implementation",{"_key":124,"_type":69,"link":125,"title":127},"391d6e2fe46d",{"slug":126,"type":12},"/training/urban-pest-management-review","Urban Pest Management Review",{"_key":129,"_type":69,"link":130,"title":132},"f640d7ae86d8",{"slug":131,"type":12},"/training/formwork-falsework-training-product-review","Formwork Falsework Training Product Review",{"_key":134,"_type":69,"link":135,"title":137},"4d2a88980dd1",{"slug":136,"type":12},"/training/swimming-pool-and-spa-service-review","Swimming Pool and Spa Service Review",{"_key":139,"_type":69,"link":140,"title":142},"4be4a01321c7",{"slug":141,"type":12},"/training/temporary-traffic-management-ttm-skill-sets","Temporary Traffic Management (TTM) Skill Sets",{"_key":144,"_type":86,"label":145},"fc066b3cd07c","Research and Planning",{"_key":147,"_type":69,"link":148,"title":150},"6c39ea7468cf",{"slug":149,"type":12},"/housing","Housing Workforce Capacity Study",{"_key":152,"_type":69,"link":153,"title":155},"3365110270df",{"slug":154,"type":12},"/projects/vet-workforce","VET Workforce Study",{"_key":157,"_type":69,"link":158,"title":160},"86f50c9e6b1b",{"slug":159,"type":12},"/projects/vet-future-readiness-review","VET Future Readiness Review",{"_key":162,"_type":69,"link":163,"title":165},"b1e60397ea2c",{"slug":164,"type":12},"/workforce-plan","2025-26 Workforce Plan",{"_key":167,"_type":69,"link":168,"title":170},"c91ae764b8d7",{"slug":169,"type":12},"/projects/water-workforce-roadmap","Water Sector Workforce Roadmap",{"_key":172,"_type":86,"label":173},"e5b8d6be1bca","Annual Plans",{"_key":175,"_type":69,"link":176,"title":178},"72df3b1af10c",{"type":27,"url":177},"https://cdn.sanity.io/files/7v56p0it/production/00d4ef72842d800018c4dc4c3f148f5c400bcd89.pdf","Annual Training Product Development Plan 2025-26","Projects",{"_key":181,"link":182,"subNavItems":184,"title":192},"1652a5d5339e",{"slug":183,"type":12},"/data-and-insights",[185,188],{"_key":186,"_type":69,"link":187,"title":48},"7a6b83df0edf",{"slug":47,"type":12},{"_key":189,"_type":69,"link":190,"title":191},"a128f4a68698",{"slug":42,"type":12},"Corporate Publications","Data and Insights",{"_key":194,"link":195,"subNavItems":61,"title":197},"5c0e7b317c37",{"slug":196,"type":12},"/advisory-bodies","Advisory Bodies",{"_key":199,"link":200,"subNavItems":61,"title":29},"2da7044eab98",{"type":27,"url":28},{"_key":202,"link":203,"subNavItems":61,"title":38},"f2986b34811b",{"slug":37,"type":12},{"_key":205,"link":206,"subNavItems":61,"title":207},"687e5bf070e0",{"slug":52,"type":12},"Contact",{"_key":209,"link":210,"subNavItems":61,"title":211},"cb55a2efe5ea",{"type":12},"Governance ",{"buttonLink":213,"content":61,"ctaType":214,"delay":215,"enabled":216,"heading":217,"linkText":218},{"slug":159,"type":12},"form",4,true,"Subscribe to our mailing list to stay informed.","Page of the Plan","BuildSkills Australia",{"_id":221,"blockBuilder":61,"seo":222,"title":192},"d178223e-f2fe-4f9c-8185-60e18edc5abe",{"description":61,"image":61,"title":192},{"_id":224,"blockBuilder":225,"seo":233,"title":43},"91f4b924-a004-433e-8161-0abf56d72b98",[226,229],{"_key":227,"_type":228},"e47724269c7c","resources",{"_key":230,"_type":231,"title":232},"358e8229da32","cta","Engage with us",{"description":61,"image":61,"title":43},[235,247,258,267,275,284,293,303,425,435,445,454,463,472,482,492,501,509,518,525,534,545,554,565,573,591,600,610,620,629,639,648],{"_id":236,"description":61,"downloads":237,"group":61,"hideTitle":246,"title":245},"010fd60d-f1cc-4d41-bc44-93ed0adddee3",[238],{"_key":239,"file":240,"label":245},"72564c901075",{"_type":241,"asset":242},"file",{"_ref":243,"_type":244},"file-257f2e2c3b14c59d0231fbdaf520a9a552b674aa-pdf","reference","The Summary of Changes.",false,{"_id":248,"description":249,"downloads":250,"group":61,"hideTitle":61,"title":257},"03809ac6-8128-4f15-b762-809d2ee9ece3","Jobs and Skills Australia is developing advice to Government on how to target the temporary skilled migration system to Australia’s workforce needs. BuildSkills' submission emphasises the need for a more strategic approach to setting the migration intake that prioritises occupations critical to securing Australia's long-term economic prosperity.",[251],{"_key":252,"file":253,"label":256},"8615a5f8002a",{"_type":241,"asset":254},{"_ref":255,"_type":244},"file-1950bd85de7c9d4c0384aebbb0a0a1e4b98d8c43-pdf","Migration (CSOL) Submission - BuildSkills Australia","Migration: submission on the draft Core Skills Occupation List",{"_id":259,"description":260,"downloads":261,"group":61,"hideTitle":246,"title":160},"17d15092-c202-484e-9a08-a7fa273b3e83","Is the training system equipped for the pace and pattern of change sweeping across industry?",[262],{"_key":263,"file":264,"label":160},"2a1ea62660e9",{"_type":241,"asset":265},{"_ref":266,"_type":244},"file-851f4ab9e78827df41a439c50c37c83b0f84a289-pdf",{"_id":268,"description":61,"downloads":269,"group":61,"hideTitle":246,"title":274},"184c8c43-8d1f-4016-ba7a-2a0532806652",[270],{"_key":271,"file":272,"label":160},"cb19f2fec084",{"_type":241,"asset":273},{"_ref":266,"_type":244},"Final Report",{"_id":276,"description":61,"downloads":277,"group":61,"hideTitle":246,"title":283},"22fe866b-d981-44ae-876d-49738b5187a5",[278],{"_key":279,"file":280,"label":245},"1aed266fc563",{"_type":241,"asset":281},{"_ref":282,"_type":244},"file-263c9008f48e8d9e066c7ac103151ea12f9d03ad-pdf","Summary of Changes ",{"_id":285,"description":61,"downloads":286,"group":61,"hideTitle":246,"title":292},"2a2a588e-c4ce-4a49-9a8f-66331319523e",[287],{"_key":288,"file":289,"label":245},"6cc9ce3cc5ad",{"_type":241,"asset":290},{"_ref":291,"_type":244},"file-1332890b8fb46444b9c29dd7bcc70aec8215ac62-pdf","The Summary of Changes",{"_id":294,"description":61,"downloads":295,"group":61,"hideTitle":246,"title":302},"3374668b-4bca-4d35-8604-e40b079e0e08",[296],{"_key":297,"file":298,"label":301},"428f982b7cf7",{"_type":241,"asset":299},{"_ref":300,"_type":244},"file-2d1dcd1d2283019807bf6adfa054d7d17d970ef3-pdf","The Summary of Change.","The Summary of Change. ",{"_id":304,"description":305,"downloads":306,"group":421,"hideTitle":61,"title":424},"43a7b615-7317-4648-a8a9-977c57d18a89","Click here to view BuildSkills' key corporate documents.",[307,313,319,325,331,337,343,349,355,361,367,373,379,385,391,397,403,409,415],{"_key":308,"file":309,"label":312},"c04e5f2d50bf",{"_type":241,"asset":310},{"_ref":311,"_type":244},"file-abe2754f6851886b6157dc4948d53808bafe0639-pdf","BuildSkills Australia Annual Corporate Governance Statement 2024",{"_key":314,"file":315,"label":318},"dc7820f01d73",{"_type":241,"asset":316},{"_ref":317,"_type":244},"file-53f85055a13a4ba589d6cdd434eef2012341a213-pdf","BuildSkills Australia Board Charter",{"_key":320,"file":321,"label":324},"2a04822fad20",{"_type":241,"asset":322},{"_ref":323,"_type":244},"file-c2bb549aee158bd68dc4c8d6fec335ec615da7aa-pdf","BuildSkills Australia Code of Conduct",{"_key":326,"file":327,"label":330},"265819eaf7f6",{"_type":241,"asset":328},{"_ref":329,"_type":244},"file-5278719770c11392062bc251898ff83c4b3f8463-pdf","BuildSkills Australia Complaints Management Policy",{"_key":332,"file":333,"label":336},"52434864a18c",{"_type":241,"asset":334},{"_ref":335,"_type":244},"file-09bd613eb1a5cfd68a7f175f84deddb45b904528-pdf","BuildSkills Australia Conflict of Interest Policy",{"_key":338,"file":339,"label":342},"0b4e6e83e903",{"_type":241,"asset":340},{"_ref":341,"_type":244},"file-8f575f20ff66b7bb09861a2db36ed092c4fc15e4-pdf","BuildSkills Australia Conflicts of Interest Register",{"_key":344,"file":345,"label":348},"89390605846e",{"_type":241,"asset":346},{"_ref":347,"_type":244},"file-c9314c5d5c34fcc1f557210ff1769de6a4ecb860-pdf","BuildSkills Australia Constitution",{"_key":350,"file":351,"label":354},"202a2dfec0b0",{"_type":241,"asset":352},{"_ref":353,"_type":244},"file-b8a51fe6bc513818057d0aa183069a74edebecf5-pdf","BuildSkills Australia Dispute Resolution Policy",{"_key":356,"file":357,"label":360},"0265e42521d5",{"_type":241,"asset":358},{"_ref":359,"_type":244},"file-1465f6f0e8d5479398dfc43be577f2143d39e4b8-pdf","BuildSkills Australia Finance Audit and Risk Committee Charter",{"_key":362,"file":363,"label":366},"6a27d835f29b",{"_type":241,"asset":364},{"_ref":365,"_type":244},"file-e15775332f691658263e7138fb5f6260118545de-pdf","BuildSkills Australia Fraud Prevention Policy",{"_key":368,"file":369,"label":372},"4a6b60e8d0a4",{"_type":241,"asset":370},{"_ref":371,"_type":244},"file-e3e83f85efacfdf4e8613b1b3a1956d1b75f0d59-pdf","BuildSkills Australia Gifts, Benefits and Hospitality Policy",{"_key":374,"file":375,"label":378},"c43b8665c555",{"_type":241,"asset":376},{"_ref":377,"_type":244},"file-1330c14ad6c58513944329f10144130ac58c27bc-pdf","BuildSkills Australia Information Management Plan",{"_key":380,"file":381,"label":384},"bc84b0e67c62",{"_type":241,"asset":382},{"_ref":383,"_type":244},"file-d7258d4d8f93cc1385679ededc24c0c07e0a129b-pdf","BuildSkills Australia Privacy Policy",{"_key":386,"file":387,"label":390},"2ff8a172f03e",{"_type":241,"asset":388},{"_ref":389,"_type":244},"file-e88c30a2f5905d5b0ab3caab13752afffa392c09-pdf","BuildSkills Australia Procurement Policy",{"_key":392,"file":393,"label":396},"caa7ffc0dd67",{"_type":241,"asset":394},{"_ref":395,"_type":244},"file-e155de505f6f6fb5c2119b45ac2d15e0f59ce183-pdf","BuildSkills Australia Risk Management Policy",{"_key":398,"file":399,"label":402},"01e7f80935f0",{"_type":241,"asset":400},{"_ref":401,"_type":244},"file-95a123826e8fef9b2e82d6d065dde8c2653a6da9-pdf","Board Remuneration Statement 2024-25 FY",{"_key":404,"file":405,"label":408},"3d37c9d6bc68",{"_type":241,"asset":406},{"_ref":407,"_type":244},"file-371520a4f6aa78c58cca3d6ab49dc2bf4bf901d9-pdf","BuildSkills Australia Stakeholder Engagement Committee Charter",{"_key":410,"file":411,"label":414},"bc085ee24348",{"_type":241,"asset":412},{"_ref":413,"_type":244},"file-15f41808fda72e0c6700854cb540479065e2d8d6-pdf","BuildSkills Australia Strategic Plan",{"_key":416,"file":417,"label":420},"524742d25e8e",{"_type":241,"asset":418},{"_ref":419,"_type":244},"file-46555220b506c2f92f78d41447d4eefcf0e7b724-pdf","BuildSkills Australia Whistleblower Policy",{"slug":422,"title":423},"corporate-documents","Corporate Documents","Governance Documents",{"_id":426,"description":61,"downloads":427,"group":61,"hideTitle":61,"title":434},"463c4ade-54f0-49d7-9192-24e6b09d9dfa",[428],{"_key":429,"file":430,"label":433},"723f2a7aa037",{"_type":241,"asset":431},{"_ref":432,"_type":244},"file-45611317332b0dfd971322cc18787a65164e2fb5-pdf","Terms of Reference.","Insulation Installation & Inspection Technical Committee Terms of Reference.",{"_id":436,"description":61,"downloads":437,"group":61,"hideTitle":246,"title":444},"5007daa4-0c2e-467c-9f5b-0505e08e851a",[438],{"_key":439,"file":440,"label":443},"ee5a2ffbbce5",{"_type":241,"asset":441},{"_ref":442,"_type":244},"file-e0ba36bbe58a69549afb1eb55e1687932bc4bfca-pdf","Terms of Reference","Urban Pest Management Project Terms of Reference",{"_id":446,"description":61,"downloads":447,"group":61,"hideTitle":246,"title":292},"50630ff9-d9ed-45be-84e1-1e9b1ba1cead",[448],{"_key":449,"file":450,"label":453},"0d711842da9a",{"_type":241,"asset":451},{"_ref":452,"_type":244},"file-7acd3bedb8385df60bb626ddbbd4e30620466b7c-pdf","Summary of Changes",{"_id":455,"description":456,"downloads":457,"group":61,"hideTitle":246,"title":155},"53c9d0f9-165a-4d87-8184-47f09c4772f0","An evidence-based look at the workforce pressures facing the VET system serving the construction, property and water industries.",[458],{"_key":459,"file":460,"label":155},"6a308391df9a",{"_type":241,"asset":461},{"_ref":462,"_type":244},"file-2a3a9594a98ff5e0872aac34a0887b4b4380c78f-pdf",{"_id":464,"description":61,"downloads":465,"group":61,"hideTitle":61,"title":471},"5614ce7c-f704-4386-b612-dd7067cb1365",[466],{"_key":467,"file":468,"label":443},"78b583e88236",{"_type":241,"asset":469},{"_ref":470,"_type":244},"file-bbd63c398ba5387de11fbc2a493bc7a89c491cd2-pdf","Engineered Stone Review Technical Committee Terms of Reference",{"_id":473,"description":474,"downloads":475,"group":61,"hideTitle":61,"title":165},"5fa3a5fa-de98-4d8d-8c4b-8741dd5192f4","Download the 2025-26 Workforce Plan for the built environment - a plan to support the achievement of the nation’s built environment objectives by helping to deliver a workforce fit for the future.",[476],{"_key":477,"file":478,"label":481},"6732c544f43c",{"_type":241,"asset":479},{"_ref":480,"_type":244},"file-9080967ca2a0e2ab33bf118247dc82de1ebdd860-pdf","2025-26 Workforce Plan - Full Report",{"_id":483,"description":61,"downloads":484,"group":61,"hideTitle":246,"title":491},"6009f06b-baa5-4069-b207-c87b4804bb30",[485],{"_key":486,"file":487,"label":490},"06d573a07e29",{"_type":241,"asset":488},{"_ref":489,"_type":244},"file-0826845e72d2f450d9f62be36daeb4ea531b23b4-xlsx","Consultation Log July25","Consultation log",{"_id":493,"description":61,"downloads":494,"group":61,"hideTitle":246,"title":500},"62b6d3e8-4477-4b79-9656-bfadd549941c",[495],{"_key":496,"file":497,"label":500},"c8fa259cce73",{"_type":241,"asset":498},{"_ref":499,"_type":244},"file-62526552c4c5f794c67d98aa44291da511e2e256-xlsx","Consultation Log",{"_id":502,"description":61,"downloads":503,"group":61,"hideTitle":246,"title":508},"6655bf6c-7d28-41e1-bed4-8516d1c7fab3",[504],{"_key":505,"file":506,"label":500},"6acdcfdb606b",{"_type":241,"asset":507},{"_ref":499,"_type":244},"Updated Consultation Log.",{"_id":510,"description":61,"downloads":511,"group":61,"hideTitle":246,"title":517},"8d9f4011-3962-42b9-8ec8-7b2dca967e19",[512],{"_key":513,"file":514,"label":433},"a37ecbcaf921",{"_type":241,"asset":515},{"_ref":516,"_type":244},"file-f6c2237ef6bbcadac721a720879b54621eee7006-pdf","The Terms of Reference",{"_id":519,"description":61,"downloads":520,"group":61,"hideTitle":246,"title":443},"aeeea24c-5dfe-44a1-8d45-531d86a3ad3d",[521],{"_key":522,"file":523,"label":443},"8eb9b3249cdb",{"_type":241,"asset":524},{"_ref":516,"_type":244},{"_id":526,"description":61,"downloads":527,"group":61,"hideTitle":61,"title":533},"c3abf6a2-2492-433a-84a6-9fe022eb60eb",[528],{"_key":529,"file":530,"label":433},"eabaa310a430",{"_type":241,"asset":531},{"_ref":532,"_type":244},"file-3e66ad9f0e80954ad5ae3481f8358657bbe8c553-pdf","Imp Prepare to Work Safely Tech Committee Terms of Reference",{"_id":535,"description":61,"downloads":536,"group":542,"hideTitle":61,"title":544},"c5f2ae0d-d5e5-4b6d-b630-d12066b79ab7",[537],{"_key":538,"file":539,"label":178},"15a8f2f45fd8",{"_type":241,"asset":540},{"_ref":541,"_type":244},"file-00d4ef72842d800018c4dc4c3f148f5c400bcd89-pdf",{"slug":543,"title":173},"annual-plans","Annual Training Product Development Plan 2025-2026",{"_id":546,"description":61,"downloads":547,"group":61,"hideTitle":61,"title":553},"c6081413-7184-43cc-b17a-01d751dbb88d",[548],{"_key":549,"file":550,"label":443},"9d2ac780d184",{"_type":241,"asset":551},{"_ref":552,"_type":244},"file-aa42cc45c5d3a7fa0afe429f57b905572cc98a3d-pdf","Hydrogen Project Terms of Reference",{"_id":555,"description":556,"downloads":557,"group":61,"hideTitle":61,"title":564},"c6ec6ab2-af69-470f-8b49-1ea66d88e9a9","Advisory Boards and Industry Reference Groups download.",[558],{"_key":559,"file":560,"label":563},"0715cf5fb923",{"_type":241,"asset":561},{"_ref":562,"_type":244},"file-543085da9708468da0b00a1e081c54c73fa62595-pdf","Download the Nomination and Selection Process Guidelines","Nomination and Selection Process Guidelines",{"_id":566,"description":61,"downloads":567,"group":61,"hideTitle":246,"title":245},"cafdb874-6fa6-41fa-8d4b-9dc99f77449b",[568],{"_key":569,"file":570,"label":245},"0a8714ad0571",{"_type":241,"asset":571},{"_ref":572,"_type":244},"file-a18b059e5c81afc8d7fd24d79d8f7be297e818d8-pdf",{"_id":574,"description":575,"downloads":576,"group":589,"hideTitle":61,"title":590},"cb8fec9f-68ef-4c6e-af20-f186c9c044b7","BuildSkills is the national Jobs and Skills Council for the built environment sector – established by the federal government to work with industry to find solutions to the workforce challenges facing the construction, property and water industries.",[577,583],{"_key":578,"file":579,"label":582},"4efa2076e7df",{"_type":241,"asset":580},{"_ref":581,"_type":244},"file-dbeb07f347f58007f77c674f8349fc208373c4d4-pdf","BuildSkills Backgrounder Digital",{"_key":584,"file":585,"label":588},"1608f19588223d5456e727fdfefeb504",{"_type":241,"asset":586},{"_ref":587,"_type":244},"file-873e3ea633c6d8e9772b5c5cf4b0cf3391c5feec-pdf","BuildSkills Backgrounder Print",{"slug":422,"title":423},"BuildSkills Backgrounder",{"_id":592,"description":61,"downloads":593,"group":61,"hideTitle":61,"title":599},"d8e14498-60fb-48a7-9dcb-e990b42a0a30",[594],{"_key":595,"file":596,"label":443},"7922b149c4e7",{"_type":241,"asset":597},{"_ref":598,"_type":244},"file-da2ba228d985bbd4957b5bbc5e2cbeb7b7c61255-pdf","Civil Construction Review Technical Committee Terms of Reference",{"_id":601,"description":61,"downloads":602,"group":609,"hideTitle":246,"title":608},"e0a0dcad-d0d4-4e94-99a2-37c00c3a5236",[603],{"_key":604,"file":605,"label":608},"cb0bebd84850",{"_type":241,"asset":606},{"_ref":607,"_type":244},"file-d64ed6f9bf8fc2332ddfc2725ad9039d627e21bd-pdf","Annual Implementation, Promotion and Monitoring Plan",{"slug":543,"title":173},{"_id":611,"description":61,"downloads":612,"group":61,"hideTitle":216,"title":619},"e2e57a82-9c4c-48d4-bc5d-c5e8b6b53245",[613],{"_key":614,"file":615,"label":618},"15926735a431",{"_type":241,"asset":616},{"_ref":617,"_type":244},"file-03a1b46183ac226dc5ace610e1ad260f7d6c1db0-pdf","Factsheet","Water Sector Workforce Roadmap - Project Factsheet",{"_id":621,"description":61,"downloads":622,"group":61,"hideTitle":61,"title":628},"e7320d1f-e737-4f91-9874-5879ad1824d5",[623],{"_key":624,"file":625,"label":443},"a4fedc444fd0",{"_type":241,"asset":626},{"_ref":627,"_type":244},"file-62579f789b3fc3ffd5fe588ecd03141144221ff6-pdf","Gap Training for Migrant Plumbers Tech Committee Terms of Reference",{"_id":630,"description":61,"downloads":631,"group":61,"hideTitle":246,"title":638},"e99d0afb-fae5-4697-85a9-44668f2967b3",[632],{"_key":633,"file":634,"label":637},"b518ec88a8f7",{"_type":241,"asset":635},{"_ref":636,"_type":244},"file-9350d188352f26d2d4e46ceec6e3ad797ef47663-pdf","The Terms of Reference ","Formwork Falsework Technical Committee Terms of Reference",{"_id":640,"description":61,"downloads":641,"group":61,"hideTitle":61,"title":647},"f76d5f40-7474-4e19-a2f8-d7be32837873",[642],{"_key":643,"file":644,"label":443},"4545a60989d7",{"_type":241,"asset":645},{"_ref":646,"_type":244},"file-409735ae7671c6c92ec70f71f4858bc0a87c7d52-pdf","Utility Location Technical Committee Terms of Reference",{"_id":649,"description":61,"downloads":650,"group":61,"hideTitle":246,"title":657},"fc0238ef-2eea-4acf-9838-68c596ce375d",[651],{"_key":652,"file":653,"label":656},"40eaef121cc1",{"_type":241,"asset":654},{"_ref":655,"_type":244},"file-f8c4c6d45f2307e6a8b50fb09bed73d7b138e8cb-pdf","Summary of Change ","Updated Summary of Change",1776036476165]